Schedule line category:
In SAP SD process, schedule line category in sales order decides whether or how the system passes on requirements to materials requirements planning (MRP).
Determination:
Schedule line category is determined based on Item Category and MRP type
- Item category is determined(sales document type + item category group + item usage + higher level item category) in sales order(screen 1.0)
- MRP type is defined in material master - MRP 1(screen 1.1)

Screen 1.0
Listed below are functions of schedule line category(refer screen 1.0)

Screen 1.0
- Default delivery block: Specifies a delivery block in SAP SD process that the system applies automatically during processing
- Movement type: Specifies a key for the type of goods movement in SAP system. Each goods movement (for example, purchase order to warehouse) is allocated to a movement type in the system. Refer the screen 1.1 for an example of good issue movement typ
1. Which of the following statements are correct?
- Billing block can be set in the sales document header and item level
- Billing block can be set in the sales document header and schedule line level
- Delivery block can be set in the sales document header and item level
- Delivery block can be set in the sales document header and schedule line level
- Partner procedure can be set at item level of a sales document.
2. Which of the following statements are correct?
- Incompletion procedure can be set at delivery document header
- Incompletion procedure can be set at delivery item level
- Incompletion procedure can be set at sales document header
- Partner procedure can be assigned to the schedule line category
- Partner procedure can be assigned to the item category of the delivery document.
1. Which of the following statements are correct?
- Pricing conditions can be indicated manually in delivery
- Pricing in shiping can contain statistical conditions
- Pricing in shiping contains header conditions
- The item category group controls whether an item in the delivery can be chargeable
- The item category controls whether an item in the delivery can be chargeable.
2. The delivery document type controls which of the following?
- Delivery split
- Over delivery
- Picking
- Packing
- Posting setup.