Sunday, 7 February 2016

SAP SD Sample Certification Questions - Set 5


Here I am posting sample SAP SD certification questions, If you are able to crack these question then you have very clear concept of SAP SD process

However, if you are serious about successful passing of SAP Certification Exam, we strongly encourage you to make use of our premium SAP SD Questions Sets

Also look

SAP SD Certification Guide
SAP SD Sample Certification Questions - Set 1
SAP SD Sample Certification Questions - Set 2
SAP SD Sample Certification Questions - Set 4
SAP SD Sample Certification Questions - Set 6


1. Which of the following statements are correct?
  1. Pricing conditions can be indicated manually in delivery
  2. Pricing in shiping can contain statistical conditions
  3. Pricing in shiping contains header conditions
  4. The item category group controls whether an item in the delivery can be chargeable
  5. The item category controls whether an item in the delivery can be chargeable.

Answers

2. The delivery document type controls which of the following?
  1. Delivery split
  2. Over delivery
  3. Picking
  4. Packing
  5. Posting setup.




3. In mandatory reference in deliveries, which of the following is allowed?
  1. Inquiry
  2. Quotation
  3. Sales order
  4. Purchase order
  5. Billing document.

4. The system does a forward scheduling if...
  1. Material availability date falls beyond today's date
  2. Material availability date falls after today's date
  3. If replenishment lead time is set
  4. If backward scheduling is not configured
  5. If backward scheduling is configured.

5. Which of the following statements are effects of a good issue?
  1. Reduces warehouse stock
  2. Reduces delivery requirement
  3. Reduces stock value
  4. Updates document flow
  5. Sets up accounts receivable posting.

6. Which of the following statements are correct?
  1. It is possible to reject items in inquiries and quotation
  2. Rejecting items is only possible in inquiries and quotations
  3. When items are rejected in an quotation, it is still possible to copy it to a sales order by creating the order with reference to the quotation
  4. It is possible to create a sales order with reference to an expired quotation
  5. The item category can be configured so that the quotation item closes once is references.

7. What influences availability check?
  1. Configuration of the sales item category
  2. Configuration of the schedule line category
  3. Configuration of the sales document type
  4. Configuration of the delivery item category
  5. Configuration of the delivery document type.

8. What influences availability check?
  1. Configuration of the delivery schedule line category
  2. Material master data
  3. Payer master data
  4. Ship-to master data
  5. Checking rule.

9. Which of the following statements are correct?
  1. It is possible to deactivate availability check in sales documents
  2. It is possible to deactivate availability check in delivery documents
  3. Scope of availability check includes the replenishment lead time
  4. Scope of availability check includes the purchase requisition
  5. Scope of availability check includes the purchase order.

10. Which of the following statements are correct re.consignments?
  1. Picking is required for consignment pick-up
  2. Consignment processing requires creation of delivery document
  3. Consignment fill-up can be billed
  4. Consignment issue can be billed
  5. Consignment return cannot be billed.

11. Which of the following statements are correct re.consignments?
  1. Consignment pick-up is relevant for billing
  2. A special stock setting in the item category is set for consignment return
  3. A special stock setting in the item category is set for consignment pick-up
  4. The schedule line category controls whether a special stock is created once PGI is done for a consignment fill-up
  5. The item category controls whether a special stock is created once PGI is done for a consignment issue.

12. Which of the following statements re:copying control are correct?
  1. If the parameter *update document flow* is not set in the item level, no document flow records are created
  2. The routine that checks whether PGI is required prior to billing document creation is found in copying control header level In the switch *copy item number* is set in the item level
  3. The system copies the item number on the source document In the switch *copy item number* is set in the header level
  4. The system copies the item from the target document Copying requirements are routines that determines the fields to be copied from the source document.

13. Which of the following statements are correct?
  1. Item category is determined automatically and cannot be changed in the sales document
  2. Item category is determined automatically and can still be changed in the sales document
  3. The material master is relevant in automatic determination of the item category
  4. The customer master is relevant in automatic determination of the item category
  5. The sales area of the sales document is relevant in automatic determination of the item category.

14. Which of the following are relevant in determining the item category?
  1. Sold-to party master data
  2. Ship-to master data
  3. Payer master data
  4. Bill-to master data
  5. Sales document type.

15. Which of the following statements are correct? (only one answer is correct)
  1. The relevance for pricing can be controlled both in the item category and schedule line category
  2. The delivery relevance can only be controlled in the item category
  3. Schedule line category is determined through the item category, MRP type and usage indicator
  4. An incompletion procedure can be set as schedule line level
  5. Schedule line category contains a billing block.

Stay Updated
Enter your email address:


Delivered by FeedBurner

No comments:

Post a Comment